AMI Smart Meters
Project Description
Madinaty is a city built on 8 thousand feddans, designed to provide a modern life for 600,000 inhabitants in 120,000 housing units, acting as a modern extension to New Cairo.
Supply and Install Smart Network to Integrate Prepayment Vending System For Electric and Water Smart Meters Using Advanced and Latest Electronic Technology Solutions.
The Master Station having the Advance Metering Infrastructure (AMI) system shall communicate with the new and existing prepaid metering system of Madinaty to achieve remote data reading, continuously monitor and track electric meters, automatic alarm events, improve billing and vending system, remote tariff exchange to analyze and improve load of electric networks, reduce cost of power consumption to consumers at certain selected tariff, automatic cut off power and water supply at lack of balance.
Case Details
- Client
- MADINATY
- What We Did
- AMI Smart Meters
- Location
- Madinaty
- Client Paid
- EGP
More Details
Project including designing, installing, test and commissioning start up of
- ETP5100 Three phase four wire AMI meter (100)A,;
- MAN3000 Prepayment Three Phase Electricity Meter
- Water Smart Meter 100mm, 25mm and 32mm prepaid,
- Meter Data Collection “SUPERCOMM”
- CAT5E-FTP CABLE